Kewco (30kW)

PROJECT OVERVIEW

Project Location
Somerton Park, SA
Solar System Type
Grid Connected
Total System Size
30kW
System Installed
September, 2013

SYSTEM OVERVIEW

PV Modules
120 x 250w CNPV Poly-Crystalline Solar Array
Panel Warranties
10 years product
25 years performance
Inverters
SMA/SHUECO International Sunny TRIPOWER STP15000TL (x2)
Inverter Warranty
5 years
Install and Design
CEC accredited, 5 year warranty

SYSTEM PERFORMANCE

Expected Output
129.7 kWh/day
Expected Energy Yield
47335 kWh/year

FINANCIAL PERFORMANCE

Payback Period
3 years
Average Savings
$16,093 in the first year

ENVIRONMENTAL BENEFITS

Greenhouse Gas (Co2) Reduction
0.815kg per kW/h produced

Why Solar? 

Kewco are a co-sponsor of the Birkalla SC and were interested to hear how Suntrix could assist their business benefit from the installation of solar on their business at Somerton Park.

Suntrix supplied a proposal for several options of which the CNPV/SMA at 30kw best suited the needs and requirements of Kewco. This will have a dramatic effect on the electricity costs of the business for them over the next 30 or so years.

This system is installed and will commissioned first week of Feb.